Minor OJS System Upgrade (v3.4.0.11), Plugin Configuration, and Journal Portal Redesign
The L-MSTI journal portal will undergo a system upgrade to OJS 3.4.0.11, ROR plugin integration, and an interface redesign starting October 10, 2026. Brief access interruptions may occur during the upgrade process.
Read more about Minor OJS System Upgrade (v3.4.0.11), Plugin Configuration, and Journal Portal Redesign




















