[1]
Simamora, E.Y.E.W. et al. 2026. Performance-Based Cycle Time Analysis for Improving the Operational Productivity of the Hauling Fleet at PT Rogomos Tapind Group. Indonesian Journal Economic Review (IJER). 6, 3 (Sept. 2026), 1405–1615. DOI:https://doi.org/10.59431/ijer.v6i3.1015.